Custom Home Timeline
At Gammon Construction we know that building a custom home is one of life’s biggest investments. To make the process smooth and enjoyable, we’ve created a step-by-step roadmap that keeps you informed and involved every step of the way. Here’s what you can expect:
1. Pre-Construction Phase
-
Kick-off Meeting: Meet with the customer to review the construction timeline, set up expectations, and discuss communication preferences.
-
Design Confirmation: Finalize floor plans, exterior elevations, and interior design choices.
-
Permit Applications & Approvals: Submit plans for permits and handle any local or community approvals needed.
-
Site Preparation: Clear the land, complete grading, and set up temporary utilities as needed.
2. Foundation Phase
-
Foundation Layout: Stake the property to mark the layout of the foundation.
-
Excavation and Footings: Begin excavation for the foundation, followed by pouring the footings.
-
Foundation Wall Construction: Construct walls (crawl space, slab, or basement) and let them cure.
-
Waterproofing & Backfill: Waterproof foundation walls and backfill the foundation area for drainage.
3. Framing Phase
-
Rough Framing: Construct the framework of the house, including walls, roof trusses, and sheathing.
-
Roof Installation: Install roof trusses and decking, adding underlayment and shingles as needed.
-
Windows and Exterior Doors: Set windows and doors for security and weatherproofing.
-
Pre-Dry-In Walkthrough: Conduct a walkthrough to show the basic structure, confirm layout, and discuss next steps.
​
4. Mechanical & Rough-Ins
-
Plumbing, Electrical & HVAC: Install plumbing pipes, electrical wiring, and HVAC ducts.
-
Inspections: Complete initial inspections to ensure code compliance for framing, electrical, plumbing, and HVAC.
-
Insulation: Install insulation in the walls and roof once rough-ins pass inspection.
5. Interior & Exterior Finishes
-
Drywall Installation: Hang and finish drywall, preparing it for painting.
-
Exterior Finishes: Apply siding, brick, or stucco and finish roofing.
-
Interior Finishes: Paint walls, install trim, cabinetry, and flooring. Follow with countertops, fixtures, and appliances.
-
Customer Walkthrough: Offer a pre-finish walkthrough to showcase progress, answer questions, and address minor adjustments.
6. Final Touches & Inspections
-
Final Inspection: Complete final inspections for all systems and structural elements.
-
Punch List Creation: With the customer, walk through and note any final touch-ups or adjustments to be made.
-
Touch-Up Completion: Address any items on the punch list to ensure the home is perfect for move-in.
7. Closing & Move-In
-
Final Walkthrough & Orientation: Review home systems, warranties, and maintenance tips.
-
Handover & Key Exchange: Celebrate with the customer and provide keys, warranties, and any necessary documentation.
-
Post-Move Support: Schedule a follow-up to address any questions or minor issues after move-in.